Half Moon Bay Accessory Dwelling Unit (ADU) Standards
New laws were recently passed, and updates will be coming soon
INFORMATION | |
Contact |
Community Development Department – 650.726.8270 |
Website | |
ADU Ordinance | |
STANDARDS | |
Zones allowed |
All residential zones (R-1, R-2, R-3) and mixed use zones with a single-family dwelling (use permit required)
|
Lot restrictions |
Must be developed with a be single-family dwelling |
Minimum lot size |
None, but minimum site area for zoning district applies |
Min / Max ADU size |
150 sf / 700 sf |
ADU building height |
Attached two story: 28 feet Attached one story: 20 feet Detached two story: 22 feet Detached one story: 13 feet |
Setbacks |
5 feet side, 10 feet rear, front same as primary dwelling which is either 20 or 25 feet depending on zoning district |
Parking requirements |
One parking space is normally required unless state exemptions are met (ADU is within 1⁄2 mile of transit, in existing structures, in historic districts, within one block of car share locations, or in an area with residential parking permit rules that do not allow second units to get a permit). Tandem parking and parking in setbacks are allowed. Exceptions to parking requirements are provided for. |
Owner occupancy |
Owner must live in the main dwelling or the ADU |
Sample fees from recently built projects* |
ADU 1 (609 sf, attached): $4,612 (does not include water fee) ADU 2 (682 sf, detached): $4,512 (does not include water fee) |
Other requirements |
|
Process |
If the ADU conforms to the zoning code (setbacks, height, etc.), the approval letter is drafted, notice is provided, and the ADU is approved by the Community Development Director pursuant to the notice. If an ADU does not conform such that a variance is required, it is processed through the Planning Commission. A Coastal Development Permit is required, which is a discretionary permit subject to public notice but not public hearing. Making an appointment to meet with a planner in the initial stages of the project can help avoid challenges and is highly recommended. |
Exceptions |
Exceptions to parking requirements are provided for. |
Disclaimer: standards and process may vary. Consultation with the contact is recommended before starting any project.
*Fees are specific to each project and will vary. Fees change regularly. These are provided as examples only.